A static timing analysis signoff tool processes a 10-million gate chip in exactly 6 hours using 4 parallel CPU cores. Assuming the tool scales perfectly linearly and memory bandwidth is not a bottleneck, exactly how long will it take to run the same analysis on a 30-million gate chip using 12 parallel CPU cores?
The workload is directly proportional to the gate count. A 30M gate chip represents 3x the workload of a 10M gate chip. The processing power is proportional to the core count. 12 cores represent 3x the processing rate of 4 cores. Because both the workload and the processing rate increased by the exact same factor of 3, the total time remains completely unchanged. Time = (3 Work) / (3 Rate) = 6 hours.