Calculate the Setup Slack for a path given the following parameters under a Max-Derate scenario:
Clock Period Tclk = 1000 ps
Launch Clock Path Delay = 200 ps, Capture Clock Path Delay = 250 ps
Data Combinational Delay = 650 ps, Launch Flop Tclk to Q = 50 ps
Capture Flop Setup Time (Tsetup = 40 ps
Clock Jitter = 30 ps
OCV Derates: Multiplier of 1.1 for Late paths (Data and Launch), Multiplier of 0.9 for Early paths (Capture)
What is the resulting setup slack?
Required Time = (Tclk + Capture Delay x Early Derate) - Tsetup - Jitter
Required Time = (1000 + 250 × 0.9) - 40 - 30 = 1225 - 70 = 1155 ps
Arrival Time = (Launch Delay x Late Derate) + Tclk→q x Late Derate + Data Delay x Late Derate
Arrival Time = (200 × 1.1) + (50 × 1.1) + (650 × 1.1) = 220 + 55 + 715 = 990ps
Setup Slack = Required Time - Arrival Time = 1155 - 990 = 165ps