A synchronous timing path operates with a 5.0ns clock period. The maximum Clock-to-Q delay is 1.0ns, and maximum combinational delay is 3.2ns. The destination setup time requirement is 0.4ns. The clock network guarantees a positive skew of 0.2ns (destination clock arrives later than source clock). However, worst-case clock jitter effectively reduces the available clock period by 0.3ns. What is the worst-case setup slack?
Explanation: Data Arrival Time = Tcq_max + Tcomb_max = 1.0ns + 3.2ns = 4.2ns. Data Required Time is calculated as: Nominal Period - Jitter Penalty + Skew - Setup Time. Required = 5.0ns - 0.3ns (jitter shrinks period) + 0.2ns (positive skew delays the capture edge, granting more time) - 0.4ns (setup requirement) = 4.5ns. Setup Slack = Required Time - Arrival Time = 4.5ns - 4.2ns = 0.3ns.